Winchester Kitchen Addition with Butler's Pantry
The project
Before the project, this kitchen had wood cabinets, a white range and a small eating corner, and the pantry beside it was lined with old open shelves and built-ins.
We started designing in early 2014 and went through several versions of the plan with 3D renderings, including changes to the entrance, before settling on a larger kitchen with an island, a full butler's pantry between the kitchen and dining room, a new entry with a mudroom where the old attached shed stood, and a new front porch. The porch sat close to the street, so it needed a special permit from the city; the homeowners filed it with our help and it passed that September. To keep the budget in line, an early estimate dropped the first-floor bath, and we chose a recirculating range hood so the kitchen didn't need a make-up air system.
Construction started in spring 2015. The homeowners asked to bring the bath back, so we added a powder room during the job. The kitchen has painted maple cabinets around the walls and a dark cherry island with open shelves on the end; the pantry matches the island and adds leaded-glass doors, wine storage and a beverage fridge.
What's included
Add-ons
Before and after
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTER
BEFORE
OUR DESIGNThe floor plan, before and after









Finishes we used
Questions about this project
What is in the butler's pantry?
Dark cherry cabinets with leaded-glass doors, wine storage, a beverage fridge, a dishwasher and a hammered bar sink, set between the kitchen and the dining room.
Why use a recirculating range hood?
Larger vented hoods can trigger a make-up air requirement under code. A recirculating hood let this kitchen keep a pro-style range without adding a make-up air system.
Did the porch need special approval?
Yes. The new front porch sat close to the street, so it needed a special permit from the city before construction, which was approved.
What do projects like this cost?
Addition, kitchen and bath projects we built from 2020 to 2025 typically ran $355k to $545k. Your price is set in a fixed-price agreement before work starts.