Arlington Kitchen, Mudroom and Powder Room Remodel
The project
The kitchen in this Arlington home sat behind a single doorway off the dining room, with dark oak cabinets, laminate counters and a back door that opened straight into the cooking space from the rear deck. There was no real place to drop coats and bags.
We measured the house and drew the existing first floor, then walked through layout options at a first meeting. The plan we settled on took down the wall between the kitchen and dining room and added a small mudroom where part of the old deck stood. The addition sits on a new frost-wall foundation, with a powder room and a closet tucked inside and a new deck outside the back door. Its energy check came in about 4% better than code.
The new kitchen has rustic alder cabinets with glass-front uppers, granite counters, a fireclay farmhouse sink and a built-in microwave drawer, with oak floors running into the dining area. A new bay window and a wide window on the back wall brighten the dining corner, and toe-kick heat keeps the kitchen warm. Our in-house team finished the work. A year later the family came back to us to redo their upstairs bathroom.
What's included
Add-ons
Before and after
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTERThe floor plan, before and after





Finishes we used
“Never could I have imagined my childhood home could be so beautiful and yet so functional.”
Questions about this project
What did this Arlington kitchen remodel include?
We took down the wall between the kitchen and dining room, built a new kitchen with rustic alder cabinets and granite counters, added a small mudroom with a powder room and closet on a new foundation, put in a bay window and a new rear deck, and added toe-kick heat.
How long did construction take?
About 22 weeks from the start of construction to completion.
Did they work with PEGASUS again?
Yes. About a year later the family came back to have us redo their upstairs bathroom.
What do projects like this cost?
Kitchens opened to adjoining rooms that we built from 2020 to 2025 typically ran $130k to $225k. Your price is set in a fixed-price agreement before work starts.