Melrose Kitchen, Mudroom and Rear Addition
The project
This older shingled house had a first floor broken into small rooms. The kitchen was a tight L with dark cabinets and a drop ceiling, the dining room was papered and closed off, and the back door opened onto a raised deck.
We kept the front of the house, the stairs and the fireplace, and took the rest of the kitchen side of the first floor back to the studs. Behind it we added a single-story addition on a new block foundation built to match the height of the old one, with a concrete-floored storage area below reached through double doors. Opening the walls meant carrying the floor above on temporary walls while four flush beams went in, so the ceilings stay clean. The new roof had to stay low enough to clear the second-floor windows, so it is a low-slope rubber roof, with a vaulted section and a skylight over the dining area.
The finished first floor has a long kitchen with maple cabinets and an island, a pantry, a mudroom and laundry, and a new bathroom with a tiled shower. Eleven new windows and a sliding door bring in light, new oak floors are woven into the refinished originals, and a composite deck runs along the back of the new fiber cement siding.
What's included
Add-ons
Before and after
BEFORE
AFTER
BEFORE
AFTER
BEFORE
AFTERThe floor plan, before and after










Finishes we used
“Jenna is both an artist and a genius. We loved her design!”
Questions about this project
What did this Melrose project include?
We took the kitchen side of the first floor back to the studs, added a single-story rear addition on a new block foundation, and built a long kitchen with an island, a pantry, a mudroom and laundry, and a new bath, with eleven new windows, a slider, new siding and a composite deck.
How do you open walls without a beam showing?
We carried the floor above on temporary walls while four beams went in flush with the ceiling joists, so the ceilings stay flat.
How long did construction take?
About 18 weeks from the start of construction to completion.
What do projects like this cost?
Addition, kitchen and bath projects we built from 2020 to 2025 typically ran $355k to $545k. Your price is set in a fixed-price agreement before work starts.