Skip to content
Open kitchen and dining area in a Melrose, MA rear addition
Melrose, MA · Design-build

Home remodeling in Melrose

Kitchens, additions and whole-house renovations, designed and built by one team.

78
Melrose projects since 2010
7
neighborhoods, from the East Side and Wyoming to the Highlands
4.9★
on Houzz, 40 reviews
25 yrs
of design-build
Our work in Melrose

Melrose projects, start to finish

Each page has the story, the photos, the floor plans where we have them, and what projects like it cost.

What we see in Melrose

What Melrose houses usually need

About 78% of Melrose homes were built before 1970 (US Census, American Community Survey 2019–23). Across our 78 Melrose jobs, the same kinds of work come up again and again.

43

Kitchens

Kitchens closed off from the dining room, often with a chimney or a load-bearing wall in the way. We take them out and carry the floor above on new beams.

36

Bathrooms

Primary baths, hall baths and powder rooms, often as part of a larger kitchen or addition project.

28

Additions

Rear additions for mudrooms and bigger kitchens, two-story additions and primary suites when the house needs more room.

Before: dark granite and raised-panel cabinets at a Melrose kitchen sink windowBEFORE
After: white cabinets and counters at the same windowAFTER
Dark granite and raised-panel cabinets gave way to white cabinets, white counters and gray elongated hex tile under the triple window. See the project
What it costs

Typical ranges for Melrose projects

The middle half of projects we built from 2020 to 2025 across all our towns, change orders included. Your price is set in a fixed-price agreement before work starts.

Kitchen opened to the next room
$130k–$225k
based on 16 jobs
Addition with a kitchen and bath
$355k–$545k
based on 24 jobs
Whole-house renovation
$335k–$550k
based on 13 jobs
See the full cost guide
Melrose clients

In their words

“Our project manager, Mike, was a superhero, visiting every day to supervise the work.”

John and Kathy J. · Houzz

“It was a really collaborative process and they were able to work around all the constraints we have.”

Matt M. · Houzz

“Thanks to Pegasus I have my dream kitchen.”

Leigh G. · Houzz

“Jenna is both an artist and a genius. We loved her design!”

Jenni S. · Google
How we work

One team from first sketch to final walkthrough

1 · Discover

We start with a conversation about your house, your goals and your budget range, and agree on scope before any drawings.

2 · Design

Our in-house designer measures the house, draws the options in 3D and sets a budget. Before construction we finish every selection and lock a firm price.

3 · Deliver

Our project manager and crew build it, with a detailed schedule and daily updates.

Questions about remodeling in Melrose

How long does a Melrose remodel take?

Construction on most of the Melrose projects on this page took about 16 to 28 weeks, from a kitchen and mudroom to a whole-house renovation with an addition. A full gut renovation of a 1915 house took longer. Design and permits come before that.

What does a remodel cost in Melrose?

Opened kitchens we built from 2020 to 2025 typically ran $130k to $225k, additions with a kitchen and bath $355k to $545k, and whole-house projects $335k to $550k. Your price is set in a fixed-price agreement before work starts. Get a range for your project

Can you take out an old chimney to open up the kitchen?

Yes. In several Melrose houses we removed an interior chimney, switching the boiler and water heater to new venting first where needed, and carried the floor above on new beams. See one of those houses

Which Melrose neighborhoods do you work in?

All of them. Most of our Melrose jobs have been on the East Side, with more in Melrose Highlands, Wyoming, Cedar Park, Oak Grove and Pine Banks, and the Horace Mann area.

What permits does a remodel need in Melrose?

Additions, alterations, demolition and new electrical, plumbing, gas or HVAC work need permits from the city’s Department of Inspectional Services, and applications go through the city’s online permitting portal. Depending on the property, the Historical Commission or the Conservation Commission may also review the work. As your contractor, we handle the permits. Melrose permitting guide

Can I add an ADU or in-law apartment in Melrose?

Yes. Melrose allows one accessory dwelling unit per lot in its residential districts, up to half the floor area of the main house or 900 square feet, whichever is less. No parking space is required, short-term rentals of 31 days or less are not allowed, and a building permit is required. Melrose ADU guide

Thinking about a project in Melrose?

Tell us about your house. We’ll tell you what projects like it cost and how we’d approach it.