Why Homeowners in the Greater Boston Area Choose Design-Build for Their Kitchen Remodels
Updated November 2026
Kitchen remodeling in Greater Boston involves much more than choosing cabinets and countertops. Most of the houses we work in, in towns like Melrose, Arlington and Winchester, are 80 to 120 years old, and the kitchen is tied into everything around it: the beam over the old dining room wall, the electrical panel, the plumbing in the basement.
That is why more homeowners here hire one design-build team instead of a separate designer and contractor. This post explains what design-build is, how to plan a kitchen with it, and what it costs and how long it takes on our projects.
Short answer: Design-build puts design, pricing and construction under one team, so the plan you approve is the plan that gets built at the price you agreed to. On our 2020–2025 projects, a kitchen that kept its layout ran about $70,000 to $125,000, and one opened to the next room $130,000 to $225,000, before appliances. Design takes 4–6 weeks; construction takes 3–5 months.
Table of Contents
What is design-build?
Why homeowners choose it for kitchens
Why older homes need more planning
How to plan a design-build kitchen
What a kitchen costs
How the process works, step by step
Frequently asked questions
What is design-build?
Design-build is a remodeling process in which one company handles the design, planning, estimating and construction of the project. Instead of hiring an architect or designer, then sending the plans out to contractors for bids, you work with one team from the first visit to the final walkthrough.
The people drawing your kitchen are the same people pricing it and building it. That keeps the design tied to real construction costs from the start, and it gives you one place to go when questions come up.

Why homeowners choose design-build for kitchens
With the traditional approach, the design is finished before anyone prices it. When the bids come back over budget, the choices are to redesign, cut scope or stretch the budget. Design-build keeps those conversations together from the beginning.
1. Budget conversations happen first
We set a budget range for your house at the first design meeting and design to it. The estimate at the end of design becomes a fixed-price agreement with allowances for the finishes you pick. It changes only if you change the job or choose finishes above an allowance.
2. One line of communication
You know who is running the project and who to call. During construction you get daily logs and a Friday summary, so you always know what happened today and what is coming next.
3. Fewer surprises mid-project
Older homes rarely behave exactly as expected once the walls open. Because the team that designed the kitchen also looked at the framing, the panel and the plumbing before pricing it, fewer of those surprises reach your budget.
4. Selections done before we start
Cabinets, counters, appliances, tile and lighting all have to fit together. We ask for every selection at least 45 days before construction starts, so the schedule holds.
Why older homes need more planning
Many homes in Melrose, Arlington and Winchester were built between the late 1800s and the early 1900s. They often come with outdated wiring, aging plumbing, uneven floors and layouts that no longer fit how families live. Earlier additions and partial renovations can hide more.
Most of the kitchens we open up in older homes here need a new beam, and many need an electrical panel upgrade. Those two items are usually what moves a kitchen from the lower range to the higher one.
— Geoff Shafer, owner
Most remodeling problems start during planning, not construction. That is where design-build earns its keep.
How to plan a design-build kitchen
Start with goals, not photos
Inspiration photos help, but start with what is not working. Who cooks, and how often? Do you want the kitchen open to the family room, or a separate room? Does it need to handle homework, entertaining or a second cook? What has to change, and what can stay?
Set a realistic budget range early
A budget range is the frame for every design decision that follows. The things that move a kitchen within its range are cabinets, counters, structural changes such as a new beam, electrical upgrades and plumbing moves. Appliances are separate: you buy them, we install them.
Spend your attention on the decisions that matter most
- Layout and traffic flow. A beautiful kitchen is still frustrating if people cross the cook's path to reach the back door.
- Cabinets and storage. Cabinetry is often the largest single cost. Deep drawers, pull-outs and a real pantry pay off every day.
- Lighting. Layer task, ambient and accent lighting.
- Appliances. Choose them early; they drive cabinet layout, ventilation and electrical needs.
- The next ten years. Plan for how your family will use the room as it changes, not for this year's trends.
Prepare for construction
Once design is done, set up a temporary kitchen, plan for noise and dust, and make a plan for kids and pets. Our post on how to survive your kitchen remodel covers the details.
What a kitchen costs and how long it takes
| Kitchen, layout stays | about $70k–$125k |
| Kitchen opened to the next room | $130k–$225k |
| Kitchen and bathroom | $165k–$360k |
| Design | 4–6 weeks |
| Construction, kitchen | 3–5 months |
| Construction, kitchen and bathroom | 15–22 weeks |
From what homeowners paid on PEGASUS projects built 2020–2025, before appliances. Ranges are the middle half of our projects.
Design is its own agreement: 1.5% of the construction estimate, with a $1,000 retainer to start. Design usually takes 4–6 weeks. For more detail, see what a home remodel costs and how long a remodel takes.
How the process works, step by step
- 15-minute call. Tell us what you are thinking about. We will say where you are likely to land in the range.
- Design meeting at your house. Our designer measures the house, looks at what is behind the walls and talks through options with you.
- Design proposal. A budget range for your house and the design fee. You say yes or no.
- Design, 4–6 weeks. Our designer draws the options in floor plans and 3D views and sets a budget, then we price it into a detailed estimate.
- Fixed-price agreement. One price with allowances for the finishes you pick.
- Selections, then build. Selections are done at least 45 days before we start. Construction takes 3–5 months for most kitchens, with daily logs and a Friday summary the whole way.

“We had our kitchen redone, and they had great ideas on layout and materials. They were extremely organized and communicative… And we love our new kitchen.”
— Paula K. · Winchester
Frequently asked questions
How much does a kitchen remodel cost in Greater Boston?
On our 2020–2025 projects, about $70,000 to $125,000 when the layout stays and $130,000 to $225,000 when the kitchen opens to the next room, before appliances. Adding a bathroom puts most projects at $165,000 to $360,000.
How long does a design-build kitchen remodel take?
Design takes 4–6 weeks. Construction takes 3–5 months for a kitchen, or 15–22 weeks for a kitchen and bathroom. Permits usually take 1–2 months and overlap with selections.
Is design-build more expensive?
Not necessarily. Design is its own agreement: 1.5% of the construction estimate, with a $1,000 retainer to start. Because the kitchen is priced while it is designed, you avoid paying for a design you cannot afford to build, and the fixed-price agreement changes only if you change the job or choose finishes above an allowance.
When should I start planning?
Several months before you want construction to start. That leaves time for 4–6 weeks of design, permits, and selections made at least 45 days before we start.
Can we live at home during a kitchen remodel?
Most families do. Plan on a temporary kitchen in another room and a few noisy, dusty weeks during demolition and rough work.
Is design-build a good fit for older homes?
Yes. Structure, electrical and plumbing are looked at during design, before the price is set, so the surprises that older houses hide are more likely to be found on paper than mid-project.
Working with PEGASUS Design-To-Build
PEGASUS Design-To-Build has designed and built kitchens, kitchen additions, home additions, whole-house renovations and primary baths since 2001: more than 480 projects, most of them in Melrose, Arlington, Winchester, Lexington, Belmont and Wakefield. See our projects or read why homeowners trust PEGASUS Design-To-Build.
See what projects like yours cost
Get a cost range, or tell us about your project and we'll talk through your kitchen.
Geoff Shafer has run PEGASUS Design-To-Build in Melrose for 25 years. He is a Massachusetts licensed Construction Supervisor and registered Home Improvement Contractor (HIC 137663).
ABOUT THE AUTHOR
Geoffrey Shafer
PEGASUS Design-To-Build
Geoffrey Shafer founded PEGASUS Design-To-Build in 2001 and brings 25 years of experience in residential construction, carpentry, and project management. His expertise includes kitchen remodeling, home additions, bathroom renovations, and whole-home remodeling throughout the Boston area. Massachusetts Construction Supervisor (1 & 2 Family) CSFA-084574
Credentials: Massachusetts Construction Supervisor License (CSFA-084574) | Home Improvement Contractor Registration (HIC #137663)