Skip to content
White Shaker kitchen with pro range, arabesque tile backsplash and bay window in Belmont, MA
Belmont, MA · Belmont Center

Belmont Kitchen and Dining Room Remodel

2 rooms
kitchen and dining room joined
~280 sq ft
of kitchen rebuilt to the studs
~4 months
of construction

The project

This family found us through a friend whose new kitchen we had built. Their own kitchen was closed off from the dining room by a wall, and they wanted a down-to-the-studs renovation with a new layout.

We opened that wall and carried the load on a new beam, so the kitchen and dining room now share one room. A white shaker peninsula faces the dining table, with a microwave drawer built in. The sink sits under the bay window, a pro-style range and stainless hood anchor the corner, and an arabesque tile backsplash and gray-veined stone counters run around the room under crystal pendants.

We settled fixtures, cabinets and appliances early in selections so the cabinet layout could be finalized, then picked counters and tile. Our crew was on site for about four months.

What's included

KitchenDining room

Add-ons

Wall opened to the dining room on a new beamPeninsula with seating and a microwave drawerPro-style range with stainless hoodArabesque tile backsplash
Dining room opened to the remodeled kitchen through a wide cased opening in Belmont, MAGray-veined stone peninsula looking toward the range, bay window and back door in Belmont, MASink under a bay window with stainless appliances and arabesque tile backsplash in Belmont, MAUndermount sink and gray-veined stone counters below a bay window in Belmont, MA
Projects like this
Kitchen opened to adjoining rooms, 16 projects we built 2020–2025
$130k–$225k
Typical range (middle half of jobs), change orders included. Your price is set in a fixed-price agreement before work starts and changes only if you change the job.
Get a range for your house
“Overall, we had a great experience with Pegasus Design-to-Build and would recommend them to anyone thinking about a home renovation.”
Anna K. · Houzz

Questions about this project

Did the kitchen and dining room become one space?

Yes. We opened the wall between them and put in a new beam, so the peninsula now faces the dining table.

How long was construction?

About four months, from mid-December to mid-April.

What was chosen first in selections?

Fixtures, cabinets and appliances, so the cabinet layout could be finalized. Counters and backsplash tile came after.

What do projects like this cost?

Kitchens opened to adjoining rooms that we built from 2020 to 2025 typically ran $130k to $225k. Your price is set in a fixed-price agreement before work starts.

Planning something similar in Belmont?
Start with a design meeting. We design it, price it and build it with our own team.